This 3-day course is designed to bring participants to the level of a suitable sparring partner with suppliers. They will be able to verify offers provided by vendors for correctness, effectiveness, and efficiency. CDCS is a must have certification for professional data center managers and personnel and is a prerequisite for individuals wishing to achieve the CDCE status.
The primary audience for this course is an IT, facilities or data center operations professional working in and around the data center and having the responsibility to achieve and improve hi availability and manageability of the data center.
After completion of the course, the attendee will be able to:
• Understand the design life cycle of data centers and the stages involved.
• Discuss the data center requirements in great level of detail with vendors, suppliers, and contractors to ensure that these requirements are met.
• Validate design plans, quotes, and offers proposed by vendors/contractors.
• Understand redundancy levels for both the data center design/setup and maintenance.
• Understand the various building considerations such as bullet proofing, mitigation of seismic activity, fire ratings, and thermal stability.
• Understand how to install a raised floor that meets requirements, avoiding misalignment, level differences, and leakage.
• Understand how to read a Single Line Electrical Diagram to identify and avoid the most common design issues.
• Choose the correct UPS and parallel configuration, learn, and avoid classic parallel installation mistakes.
• Understand how to calculate battery banks, validate offered configurations to ensure they meet requirements.
• Understand what distance to keep to avoid EMF issues for human safety and equipment disturbances.
• Understand the fundamental cooling setup, CFM, Delta-T and other important factors.
• Understand contamination factors and limitations.
• Understand full details of fire suppression options, how to calculate gas content and verify installations.
• Understand how to measure data center energy efficiency and how to improve it.
• Overview of the phases of a data center life cycle
• Planning, re-alignment and continuous improvement
• Rating level history
• Difference between Uptime and TIA-942
• Rating level definitions
• Redundancy options (N+1), 2N, 2(N+1)
• Concurrent Maintainability/Compartmentalization
• Example configurations
• Substation and feed requirements
• Maintenance options
• Operational processes guidelines/Standards
• Skill development
• Building location considerations
• Floor and hanging load requirements
• Fire rating for walls and glass
• Blast protection
• Bullet proofing
• Forced entry protection
• Raised floor installation guidelines
• Techniques to install a proper and leveled raised access floor
• Common mistakes
• Choosing the right tiles and their locations
• Seismic mitigating floor constructions
• Choosing the correct suspended ceiling
• Power infrastructure layout
• Generators
• UPS systems
• Harmonic filters
• Battery banks
• Sources of EMF
• Differences between single, three phase and bus-bar EMF sources
• Options available to measure EMF and how to interpret the results from single-axes and composite measurements
• Guidance on safe distance for equipment and humans
• Calculation of EMF attenuation factor for shielding material permeability and saturation factors
• Important definitions; dry-bulb, wet-bulb, dew-point, RH, sensible and latent heat
• Psychometric diagram and ASHRAE recommendations
• Environmental class definitions and thermal specifications
• Temperature/Humidity measurements guideline
• Heat dissipation methods
• Altitude impact on temperature intake to ICT equipment
• Floor plan setup for effective cooling
• Differences in tile surface and supporting structure, and their airflow performance impact
• Rack door construction and the flow performance impact
• Equipment Delta-T and its impact
• Optimizing airflow
• Thermal units conversions
• Calculations for air volume displacement (CFM/CMH)
• Cooling capacity calculations
• Air-conditioning selection
• De-humidifying/humidifying options
• Air-conditioning efficiency
• SHR impact on cost saving
• Efficiency indicator
• New cooling principle and techniques (Submerged, VSD/VRF/ECF/water- and air side economizers)
• Redundancy guidelines for air-conditioners avoiding classic misconceptions and mistakes for meeting ANSI/TIA-942 compliant designs
• Installation requirements
• Connections to fire panel and EPO
• Commissioning of air-conditioners
• Set points and calibration
• CFD (Computational Fluid Dynamics)
• Fire triangle and elements to stop a fire
• Detection systems in detail (VESDA, VIEW, smoke sensors)
• Considerations for installation of sensors
• Proper testing of smoke sensors
• Water based systems i.e., deluge, wet-pipe, dry-pipe, pre-action and why most of them don’t work and how to detect this
• Details on inert, halocarbon systems and how to select the correct system for your data center
• How to calculate the gas content ensuring the appropriate level is installed to suppress the fire including safety considerations
• Other requirements for gas systems (release times, hold times, pipe install requirements, and other important factors)
• Requirements for the fire detection panel
• Installation verification, methods, what to check and how
• New advanced fire suppression technologies
• ANSI/TIA-942 cabling structure topology
• ToR, EoR Design
• Intelligent patching systems
• Installation best practice such as routing, bending radius, separation from power, containment fill ratio, fiber link loss calculator, bonding and grounding requirement
• Standard for telecommunications labeling and administration
• Acoustic noise effects, regulations, specifications, and limits
• Data center contaminations and classifications
• Measurements, standards, and limits
• Preventive measures and avoidance
• Business drivers to go Green
• High-availability or Green?
• Green guidelines and standards
• How to measure it and what are acceptable numbers compare to the general industry
• PUE classes defined by Green Grid and issues with PUE
• Techniques for saving energy in all parts of the data center i.e., application/system level, cooling, power distribution
Participants must hold a valid CDCP certificate (HK258S) in order to be able to register for the CDCS class.
Firma NT GROUP Sp. z o.o. jest Autoryzowanym partnerem firmy HPE
Spółka posiada wpis do ewidencji placówek niepublicznych Nr ew. ES.VIII.4320-6/p.n./2003 wydany z upoważnienia Prezydenta Miasta Łodzi
Zachęcamy do skorzystania z możliwości dofinansowania szkoleń oferowanych przez naszą firmę. Dostępne rozwiązania:
Skontaktuj się z nami, aby uzyskać więcej informacji. Oferujemy pełne wsparcie w tym procesie.
Zapraszamy!
|
|
The exam is a one and a half hour, 60 questions, multiple choice and closed book exam. The candidate requires a minimum of 45 correct answers to pass the exam. Attendees passing the exam will be awarded the internationally accredited and recognized “Certified Data Center Specialist” certificate (CDCS). The certification is valid for three years after which the student needs to re-certify.
Najbliższy termin: Prosimy o kontakt
Najbliższy termin: Prosimy o kontakt
Najbliższy termin: Prosimy o kontakt
Najbliższy termin: 10-12-2024 09:00
Najbliższy termin: Prosimy o kontakt
Najbliższy termin: Prosimy o kontakt
Najbliższy termin: Prosimy o kontakt
Najbliższy termin: Prosimy o kontakt
Najbliższy termin: 12-12-2024 09:00
Najbliższy termin: Prosimy o kontakt
Najbliższy termin: Prosimy o kontakt
Najbliższy termin: 04-12-2024 09:00